Platform/Document Intelligence & Contract RAG

Document Summarization & Contract RAG

Upload contracts, complex BOQs, drawings' notes, and meeting minutes. Ask high-stakes questions like "What's the payment term for this vendor?" or "What notice period is required for rain delay claims?" and get instant, cited answers.

Retrieval-Augmented Generation on FIDIC EPC AgreementCITED CLAUSE REFERENCE: FIDIC VOL II PAGE 48
ACTIVE DOCUMENT INDEX (324 PAGES):
Nagarjuna_FIDIC_EPC_Contract_2026.pdf
14.2 MB • Embedded into Vector Store
PROJECT DIRECTOR QUERY:
"What's the payment term for this vendor under the MEP agreement, and what is our delay penalty cap?"
EXTRACTED CONTRACT ANSWERPAGE CITATIONS VERIFIED
1. Payment Terms (Clause 14.3): Net 30 calendar days following joint physical measurement certification and submission of audited tax invoice. A mandatory 5% retention is deducted from interim bills until final Defect Liability Certificate issuance.
2. Liquidated Damages Cap (Clause 8.7): 0.5% per week of delay up to a maximum contractual cap of 10% of total contract value. Liquidated damages cannot be assessed if valid weather delay notice was submitted within 14 calendar days.
Direct Citation: Page 48 (Section 14.3) & Page 27 (Section 8.7)Zero Hallucinations Verified

Multi-Document RAG

Upload hundreds of contracts, BOQs, and meeting minutes. Supersite correlates clauses across documents without hallucination.

Dispute & Claim Defense

Instantly verify whether a subcontractor's unseasonal rain claim meets the strict notice-of-delay criteria before paying disputed sums.

Drawing Revision Delta Summaries

Compare architectural Revision 2 vs Revision 3 notes to instantly identify structural scope changes that warrant a Change Order.