Case Study: How Nagarjuna Construction Company Monitored AIIMS Bilaspur with Supersite
Deploying enterprise site intelligence across a premier $100M+ healthcare campus project in the challenging terrain of Himachal Pradesh.
E
Enterprise Client Success
Strategic Accounts
EXECUTIVE SUMMARY & KEY TAKEAWAYS
Discover how NCC deployed Supersite to streamline multi-contractor coordination, accelerate daily DPR generation, and maintain real-time visibility across complex mountain healthcare infrastructure.
### Project Overview: AIIMS Hospital Bilaspur, HP
- Client: Nagarjuna Construction Company (NCC)
- Project Scope: Premier All India Institute of Medical Sciences (AIIMS) healthcare campus in Bilaspur, Himachal Pradesh.
- Key Challenges: Mountainous geography, multiple specialized MEP and civil subcontractors, aggressive government milestones, and dispersed stakeholder oversight.
The Challenge
With over a dozen distinct building blocks under simultaneous construction, the NCC project leadership faced severe information latency. Daily progress logs took hours to compile, making it difficult to detect trade clashes between structural works and specialized hospital gas/MEP installations.
*"AIIMS Hospital, Himachal Pradesh project is our prestigious project and we wanted the best monitoring solution for it. Project monitoring on Supersite is a delight."*
> — **G. RamaKrishna Reddy**, VP North, Nagarjuna Construction Company
The Supersite Implementation
1. **Multi-Block Mobile DPR Ingestion**: Over 40 site supervisors and quality inspectors were onboarded with mobile voice and photo capture.
2. **Centralized Material & Pour Tracking**: Daily concrete batching plant deliveries were reconciled directly against placed slab volumes.
3. **Real-Time Issue & RFI Resolution**: Inter-departmental clashing was documented visually, reducing RFI cycle times from 8 days to under 24 hours.
Quantified Results
- **82% faster DPR completion**: Field engineers saved an estimated 1.5 hours per day.
- **100% auditable photographic archive**: Every critical slab, foundation footing, and medical gas pipeline installation was cataloged by room and floor.
- **Zero major handover discrepancies**: Subcontractor bill certification time was reduced by 60%.
TOPICS:#Nagarjuna Construction#AIIMS Bilaspur#Healthcare Mega-Project#Case Study